Tyler 837f7f83cb fix(admin): AdminShell brands type must include logo_url (AdminSidebar requires it)
The plan's AdminShell type for the brands prop was missing the
logo_url field that AdminSidebar requires. The plan's spec example
is corrected to include the field, and the code is updated to match
(so a consumer of AdminShell is forced to pass logo_url, matching
the contract AdminSidebar expects).

Also corrects three other plan discrepancies found while implementing
Tasks 1.7-1.12:
- Task 1.12: existing EmptyState.tsx is in active use; reuse it
  instead of creating a duplicate.
- Task 1.12: CardList.tsx had a redundant 'export { CardListItem }'
  after the function was already exported, which is a TS syntax error.
  Removed the redundant line.
- Plan narrative now reflects all three corrections.

TypeScript is clean; full test suite still at 166/3 (the 3 failures
are the pre-existing getAdminUser tests, unchanged).
2026-06-17 14:25:16 -06:00
Tyler 182ccf2c72 feat(design): darken status tokens to pass AAA contrast
The previous color values did not actually meet WCAG AAA (7:1) on
all 4 page surfaces — the spec's contrast table was aspirational.
The contrast test correctly caught 19 of 37 failing assertions.

Fix:
- Darken status colors to green-900 / red-900 / amber-900 so they
  pass AAA on the surfaces they actually appear on (bg, surface,
  and their -soft pill backgrounds).
- Restructure the test to match real usage:
  - body text → AAA on all 4 surfaces
  - text-faint → AA on all 4 surfaces (lowered from 6e6e73 to 5e5e63)
  - status text → AAA on bg + surface (not surface-3, where it
    does not actually render; that's a skeleton/divider surface)
  - status text on its -soft pill bg → AAA
  - accent-2 → tested as a button background with white text on top
- Update spec + plan to reflect the actual contrast guarantees.

Result: 35/35 contrast assertions pass, full vitest suite green