Add three critical documents for Scanner PWA production deployment:
1. STAGING_ROLLOUT_CHECKLIST.md - Main operational checklist
- Pre-event setup procedures for IT/admin team
- Staff device setup with PWA installation steps
- Day-of operations and gate management protocols
- Post-event data sync and cleanup procedures
- Emergency fallback procedures and escalation contacts
2. STAFF_TRAINING_MATERIALS.md - Gate staff training resources
- Step-by-step device setup for iOS/Android
- Scanner operation guide with result interpretation
- Troubleshooting guide for common issues
- Professional smartphone usage tips for all-day events
- Quick reference cards and emergency procedures
3. SCANNER_TECHNICAL_RUNBOOK.md - IT administrator guide
- Complete system architecture and API documentation
- Environment setup for staging/production deployment
- Monitoring, alerting, and performance baseline configuration
- Network requirements and quality management
- Security considerations and vulnerability management
- Escalation procedures and maintenance schedules
These documents provide complete operational readiness for Scanner PWA
deployment, ensuring smooth gate operations with minimal day-of issues.
Staff preparation procedures are designed for temporary/volunteer workers
with clear, simple instructions and comprehensive emergency protocols.
🤖 Generated with [Claude Code](https://claude.ai/code)
Co-Authored-By: Claude <noreply@anthropic.com>